![background image](http://html1.mh-extra.com/html/abbott/cell-dyn-3000/cell-dyn-3000_operators-manual_450973423.webp)
9-42
CELL-DYN
3000 System Operator’s Manual
9140240E — May 1995
Maintenance
Chapter 9
8.
Replace the white caps on the line.
9.
10.
Replace the upper and lower front covers on the Analyzer.
11.
Power ON the Analyzer and then power ON the Data Station.
12.
Verify that the background counts are acceptable by running 5
background counts before running controls. If
or controls are unacceptable, refer to
Search
Go Back
Book TOC