2-2
CELL-DYN
3000 System Operator’s Manual
9140240E — May 1995
Installation
Chapter 2
Initial Preparation
The instrument is shipped from the factory as follows:
CELL-DYN 3000SL
•
Analyzer
•
Data Station
•
Sample Loader with accessories
•
CELL-DYN 3000 Accessory Kit
•
Printer
•
Reagents, Calibrator, and Controls necessary for installation
CELL-DYN 3000CS
•
Analyzer
•
Data Station
•
CELL-DYN 3000 Accessory Kit
•
Printer
•
Reagents, Calibrator and Controls necessary for installation
Space Requirements
Approximately five linear feet of space is required on the counter top,
and sufficient space is required beneath for Diluent, Hemoglobin Lyse,
Sheath, and waste container (if one is used).
Allow six inches of space behind and on the left side of the Analyzer for
air flow. A constant circulating internal air stream is required to cool
circuitry and components whenever the power is ON. Also allow six
inches of space behind the Data Station for air flow. The Data Station
may be placed in direct contact with the right side of the Analyzer. If
possible, allow 24 inches of space above and to either side of the
instrument for service access.
Locate the instrument:
•
Away from direct sunlight
•
Away from the path of a cooled or heated air outlet
•
Far from a centrifuge, x-ray equipment, CRT, video terminal,
computer or copier
•
Place the reagents below the instrument.
Search
Go Back
Book TOC