![background image](http://html1.mh-extra.com/html/abbott/cell-dyn-3000/cell-dyn-3000_operators-manual_450973284.webp)
CELL-DYN
3000 System Operator’s Manual
6-29
9140240E — May 1995
Chapter 6
Calibration
CELL-DYN 3000
PRE-CALIBRATION PROCEDURES CHECK LIST
Instrument:__________________________________
Date:_____________________________________________
Operator:____________________________________
________________________________________________________________________________________
____
1._______ Perform all required maintenance.
2._______ Verify that all the reagent containers are at least 1/3 full and that the waste container is
less than 1/2 full.
3._______ Verify that the reagents have not reached the expiration date.
Diluent:
Lot #____________Exp. Date _______
HGB Lyse:
Lot #____________ Exp. Date _______
Sheath Reagent:
Lot #____________ Exp. Date _______
4._______ If applicable, verify that the calibrator has not reached the expiration date.
Lot #____________ Exp. Date _______
5._______ After the maintenance has been completed, verify that the Background Counts are
within the acceptable limits. Record the background counts below or attach a printout
to this document.
WBC
<
0.5
________
RBC
<
0.05
________
HGB
<
0.2
________
PLT
<1
0.0
________
6._______ Verify that the RBC Count Time is at the baseline value. Record the count time below.
RBC Count Time __________
7._______ From the DIAGNOSTICS MENU, obtain a printout of the VOLTAGE READINGS Screen.
8._______ Prime the instrument with five normal whole blood samples.
Search
Go Back
Book TOC