CELL-DYN
3000 System Operator’s Manual
2-11
9140240E — May 1995
Chapter 2 Installation
5.
Place five racks in the open area to the left of the tower and five
racks in the open area to the right of the tower. Push all of the right
side racks toward the Analyzer. Pull all of the left side racks away
from the Analyzer. All ten racks are required to be in place for
proper operation.
NOTE: Be sure each rack is placed with its bar coded rack ID
label and open slot facing toward the Analyzer.
NOTE: Liquid spills in the rack drive mechanism are a potential
reason for failure of the rack to advance. Liquid spills that flow
in the Sample Loader Control Panel could cause operational
failure. Notify the
assistance.
Figure 2.4: Tube Rack Showing Label Placement Location
Power On
1.
Sample Loader power switch on the right side panel
ON. When the initialization process is complete, the light above the
Sample Loader START key flashes. This indicates that the Sample
Loader is ready to start processing samples. The message AUTO
SAMPLER READY is displayed in the Data Station bulletin line.
Black End Rack Visual Indicator Label
(END RACK ONLY)
Rack ID
Number
Label
Tube
Rack
Black End Rack Sensor Label
(END RACK ONLY)
Orient Numbered End
DOWNWARD
Bar Coded Rack
ID Label
Bar Coded
Position
ID Label
Search
Go Back
Book TOC