Activating
signal GREEN
LED
IEC09000312_1_en.vsd
G
R
G
G
Activating
signal RED
IEC09000312 V1 EN-US
Figure 16:
Operating sequence 1, two colors
Sequence 2
(Follow-F)
SEMOD56072-47 v2
This sequence is the same as
Sequence 1
, Follow-S, but the LEDs are flashing instead
of showing steady light.
Sequence 3
LatchedAck-F-S
SEMOD56072-50 v2
This sequence has a latched function and works in collecting mode. Every LED is
independent of the other LEDs in its operation. At the activation of the input signal, the
indication starts flashing. After acknowledgment the indication disappears if the signal
is not present any more. If the signal is still present after acknowledgment it gets a
steady light.
Activating
signal
LED
Acknow.
en01000231.vsd
IEC01000231 V1 EN-US
Figure 17:
Operating Sequence 3 LatchedAck-F-S
GUID-CC607709-5344-4C88-AA97-6395FD335E55 v5
The sequence described below is valid only if the same function block
is used for all three colour LEDs.
When an acknowledgment is performed, all indications that appear before the
indication with higher priority has been reset, will be acknowledged, independent of if
the low priority indication appeared before or after acknowledgment. In figure
it is
shown the sequence when a signal of lower priority becomes activated after
1MRK 511 408-UUS A
Section 5
Local Human-Machine-Interface LHMI
Phasor measurement unit RES670 2.2 ANSI
93
Technical manual
Summary of Contents for Relion RES670
Page 1: ...RELION 670 SERIES Phasor measurement unit RES670 Version 2 2 ANSI Technical manual ...
Page 2: ......
Page 276: ...270 ...
Page 306: ...300 ...
Page 360: ...354 ...
Page 406: ...400 ...
Page 614: ...608 ...
Page 732: ...726 ...
Page 748: ...742 ...
Page 884: ...878 ...
Page 932: ...926 ...
Page 933: ...927 ...