![ABB Relion RES670 Technical Manual Download Page 845](http://html.mh-extra.com/html/abb/relion-res670/relion-res670_technical-manual_4485845.webp)
M12584-1 v7
Table 660:
IOM with MOV and IOM 220/250 V, 110mA - contact data (reference standard: IEC
61810-2)
Function or quantity
Trip and Signal relays
Fast signal relays (parallel reed
relay)
Binary outputs
IOM: 10
IOM: 2
Max system voltage
250 V AC, DC
250 V DC
Test voltage across open
contact, 1 min
250 V rms
250 V rms
Current carrying capacity
Per relay, continuous
Per relay, 1 s
Per process connector pin,
continuous
8 A
10 A
12 A
8 A
10 A
12 A
Making capacity at inductive
loadwith L/R > 10 ms
0.2 s
1.0 s
30 A
10 A
0.4 A
0.4 A
Making capacity at resistive load
0.2 s
1.0 s
30 A
10 A
220–250 V/0.4 A
110–125 V/0.4 A
48–60 V/0.2 A
24–30 V/0.1 A
Breaking capacity for AC, cos
j
> 0.4
250 V/8.0 A
250 V/8.0 A
Breaking capacity for DC with
L/R < 40 ms
48 V/1 A
110 V/0.4 A
220 V/0.2 A
250 V/0.15 A
48 V/1 A
110 V/0.4 A
220 V/0.2 A
250 V/0.15 A
Maximum capacitive load
-
10 nF
Maximum 72 outputs may be activated simultaneously with influencing
factors within nominal range. After 6 ms an additional 24 outputs may
be activated. The activation time for the 96 outputs must not exceed
200 ms. 48 outputs can be activated during 1 s. Continued activation is
possible with respect to current consumption but after 5 minutes the
temperature rise will adversely affect the hardware life. Maximum two
relays per BOM/IOM/SOM should be activated continuously due to
power dissipation.
1MRK 511 408-UUS A
Section 23
IED hardware
Phasor measurement unit RES670 2.2 ANSI
839
Technical manual
Summary of Contents for Relion RES670
Page 1: ...RELION 670 SERIES Phasor measurement unit RES670 Version 2 2 ANSI Technical manual ...
Page 2: ......
Page 276: ...270 ...
Page 306: ...300 ...
Page 360: ...354 ...
Page 406: ...400 ...
Page 614: ...608 ...
Page 732: ...726 ...
Page 748: ...742 ...
Page 884: ...878 ...
Page 932: ...926 ...
Page 933: ...927 ...