Section 19
Station communication
19.1
Communication protocols
M14815-3 v13
Each IED is provided with several communication interfaces enabling it to connect to
one or many substation level systems or equipment, either on the Substation
Automation (SA) bus or Substation Monitoring (SM) bus.
Available communication protocols are:
•
IEC 61850-8-1 communication protocol
•
IEC/UCA 61850-9-2LE communication protocol
•
LON communication protocol
•
SPA communication protocol
•
IEC 60870-5-103 communication protocol
•
DNP 3.0 communication protocol
•
C37.118 communication protocol
Several protocols can be combined in the same IED.
19.2
Communication protocol diagnostics
GUID-6BC4671F-6D06-4BBD-B1FF-2F03FF16A856 v1
Status of the protocols can be viewed in the LHMI under
Main menu/
Diagnostics/IED status/Protocol diagnostics.
The diagnostic values are:
Diagnostic value
Description
Off
Protocol is turned off
Error
An error has occured, refer to event list for more
information
Warning
Configuration inconsistency. Unable to locate data
point.
Ready
Protocol is ready
1MRK 511 408-UUS A
Section 19
Station communication
Phasor measurement unit RES670 2.2 ANSI
625
Technical manual
Summary of Contents for Relion RES670
Page 1: ...RELION 670 SERIES Phasor measurement unit RES670 Version 2 2 ANSI Technical manual ...
Page 2: ......
Page 276: ...270 ...
Page 306: ...300 ...
Page 360: ...354 ...
Page 406: ...400 ...
Page 614: ...608 ...
Page 732: ...726 ...
Page 748: ...742 ...
Page 884: ...878 ...
Page 932: ...926 ...
Page 933: ...927 ...