![ABB DressPack IRB 6640 Product Manual Download Page 288](http://html.mh-extra.com/html/abb/dresspack-irb-6640/dresspack-irb-6640_product-manual_5004288.webp)
Note
Action
xx1200000112
Check that the screws on the hose clamps
are fitted in the correct position.
Note
Do not place the screws on the outside of
the hose reinforcement funnel!
On top, below or (as shown in the figure)
on the inside are all correct placement of
the screws.
6
Refitting step 3 - Cable and hose retainer (wrist)
Use this procedure to fit the clamp jaw (wrist).
Note
Action
PROC 1
PROC 2
PROC 4
CPS
FB7
SP
WELD U
WELD V
WELD EARTH
PROC 3
xx1200000106
Arrange cable and hoses according to their
position in the cable and hose retainer.
1
Note
This is an example showing the Paracom
cable harness. If in doubt check the posi-
tions on a cable and hose retainer that still
is fitted.
Continues on next page
288
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
4 Repair
4.2.12 Replacing the protection hose - IRBDP SW6 UI and MH6 UI - Upper arm
Continued
Summary of Contents for DressPack IRB 6640
Page 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 220: ...This page is intentionally left blank ...
Page 324: ...This page is intentionally left blank ...
Page 338: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 366: ...This page is intentionally left blank ...
Page 369: ......