Removing step 2 - Cable and hose retainer (wrist) & hose reinforcement funnel
Use this procedure to remove the cable and hose retainer (wrist) and the hose
reinforcement funnel.
Note
Let the cable package stay fitted in the ball joint housing on the upper arm tube
during this procedure.
Note
Action
xx1200000102
Remove the
clamp jaw
closest to the wrist.
1
xx1200000159
Remove the
hose clamp
securing the cable
and hose retainer.
2
xx1200000103
Remove the
cable and hose retainer
.
3
Continues on next page
282
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
4 Repair
4.2.12 Replacing the protection hose - IRBDP SW6 UI and MH6 UI - Upper arm
Continued
Summary of Contents for DressPack IRB 6640
Page 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 220: ...This page is intentionally left blank ...
Page 324: ...This page is intentionally left blank ...
Page 338: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 366: ...This page is intentionally left blank ...
Page 369: ......