![ABB DressPack IRB 6640 Product Manual Download Page 140](http://html.mh-extra.com/html/abb/dresspack-irb-6640/dresspack-irb-6640_product-manual_5004140.webp)
Note
Action
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
2
Tip
This procedure is best done by two per-
sons working together - one pushing cables
and hoses into the tube and one pulling
them out in the back of the robot.
Push the
cable package
carefully into the
upper arm and in through the tube.
This is best done following this order:
1: Cables (excluding weld cables)
2: Hoses
3: Weld cables
3
Fit the
weld cables
in the open weld con-
nector.
4
xx1200000058
Fit the
cable strain relief
.
5
Attachment screws:
M5x25 quality 8.8-A2F (2 pcs)
xx1200000075
Connect the
weld cable
.
6
Continues on next page
140
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
2 Installation
2.2.14 Fitting the cable package IRBDP SW6 & MH6 UI/LE, Lean ID
Continued
Summary of Contents for DressPack IRB 6640
Page 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 220: ...This page is intentionally left blank ...
Page 324: ...This page is intentionally left blank ...
Page 338: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 366: ...This page is intentionally left blank ...
Page 369: ......