![ABB DressPack IRB 6640 Product Manual Download Page 200](http://html.mh-extra.com/html/abb/dresspack-irb-6640/dresspack-irb-6640_product-manual_5004200.webp)
3.3.2 Preventive inspection, DressPack upper arm
Location of DressPack upper arm
The figure shows the cable package IRBDP SW2 UE.
xx0800000086
Tension arm unit
A
Ball joint housing (tension arm unit)
B
Process cable package, upper arm
C
Ball joint housing (process cable support axis 6)
D
Process cable support axis 6
E
Continues on next page
200
Product manual - DressPack/SpotPack IRB 6640
3HAC028638-001 Revision: K
© Copyright 2007-2018 ABB. All rights reserved.
3 Maintenance
3.3.2 Preventive inspection, DressPack upper arm
Summary of Contents for DressPack IRB 6640
Page 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6640 ...
Page 8: ...This page is intentionally left blank ...
Page 18: ...This page is intentionally left blank ...
Page 44: ...This page is intentionally left blank ...
Page 194: ...This page is intentionally left blank ...
Page 220: ...This page is intentionally left blank ...
Page 324: ...This page is intentionally left blank ...
Page 338: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 366: ...This page is intentionally left blank ...
Page 369: ......