E
MAINTENANCE SPECIFICATIONS
MAINTENANCE SPECIFICATIONS
POWER UNIT
Unit
Model
Item
Worldwide
E60HMHD
E60HWHD
E60HWD
USA, Canada
E60MH
E60EH
—
CYLINDER HEAD
Warpage limit
mm (in)
0.1 (0.004)
CYLINDERS
Bore size
mm (in)
72.00 - 72.02 (2.8346 - 2.8354)
Wear limit
mm (in)
72.10 (2.8386)
Taper limit
mm (in)
0.08 (0.003)
Out-of-round limit
mm (in)
0.05 (0.002)
PISTON
Piston diameter (D)
mm (in)
71.940 - 71.965 (2.8323 - 2.8333)
Measuring point (H)
mm (in)
10 (0.4)
Piston-cylinder clearance
mm (in)
0.055 - 0.060 (0.0022 - 0.0024)
<Limit>
mm (in)
0.11 (0.0043)
Pin boss inside diameter
mm (in)
19.904 - 19.915 (0.7839 - 0.7841)
Ring groove side clearance
(installed)
mm (in)
Top
mm (in)
0.03 - 0.07 (0.001 - 0.003)
2nd
mm (in)
0.03 - 0.07 (0.001 - 0.003)
Over size piston Diameter
Top (Except for USA)
mm (in)
72.25 (2.844)
2nd
mm (in)
72.50 (2.854)
PISTON PIN
Diameter (D)
mm (in)
19.895 - 19.900 (0.7833 - 0.7835)
PISTON RING (1ST)
Type
Keystone
Dimensions (BxT)
mm (in)
2.0 x 3.0 (0.08 x 0.12)
End gap (installed)
mm (in)
0.30 x 0.50 (0.012 x 0.020)
<limit>
mm (in)
0.70 (0.028)
PISTON RING (2nd)
Type
Keystone
Dimensions (B x T)
mm (in)
2.0 x 3.0 (0.08 x 0.12)
End gap (installed)
mm (in)
0.30 x 0.50 (0.012 x 0.020)
<limit>
mm (in)
0.70 (0.028)
2-3
Содержание 55BET 55DEHD E60HMHD
Страница 84: ...E DIMENSIONS DIMENSIONS OUTBOARD DIMENSIONS 2 8 ...
Страница 86: ...F DIMENSIONS DIMENSIONS DIMENSIONS HORS TOUT 2 8 ...
Страница 88: ...D ABMESSUNGEN ABMESSUNGEN ABMESSUNGEN DES AUSSENBORDMOTORS 2 8 ...
Страница 90: ...ES DIMENSIONES DIMENSIONES DIMENSIONES DEL FUERA BORDA 2 8 ...
Страница 92: ...E DIMENSIONS BRACKET DIMENSIONS 2 10 ...
Страница 94: ...F DIMENSIONS DIMENSIONS DU SUPPORT 2 10 ...
Страница 96: ...D ABMESSUNGEN ABMESSUNGEN DER HALTERUNG 2 10 ...
Страница 98: ...ES DIMENSIONES DIMENSIONES DEL SOPORTE 2 10 ...
Страница 110: ...FUEL SYSTEM E FUEL SYSTEM CHECKING THE FUEL LINE 1 Fuel joint 2 Fuel filter 3 Fuel pump 4 Carburetor 3 3 ...
Страница 134: ...E CONTROL SYSTEM ADJUSTING THE THROTTLE CABLE E60HWD 1 Throttle cable 2 Throttle control lever 3 15 ...
Страница 138: ...E CONTROL SYSTEM ADJUSTING THE SHIFT CABLE E60HMHD E60MH E60HWHD E60EH 1 Shift lever 2 Shift rod 3 Shift actuator 3 17 ...
Страница 142: ...E CONTROL SYSTEM ADJUSTING THE SHIFT CABLE E60HWD 1 Shift cable 2 Shift actuator 3 19 ...
Страница 158: ...GENERAL E 3 27 ...
Страница 159: ...GENERAL ES ALLGEMEINES D GENERALITES F 3 27 ...
Страница 162: ...FUEL LINE E FUEL LINE 1 Fuel joint 2 Fuel filter 3 Fuel pump 4 Carburetor 4 1 ...
Страница 198: ...E RECOIL STARTER ASSEMBLY Step Job Part Q ty Remarks 14 Bushing 6 For installation reverse the removal procedure 5 2 ...
Страница 408: ...UPPER CASE ASSEMBLY E REMOVING THE GROUND LEAD Remove Ground lead NOTE Remove the lead at three different points 7 17 ...
Страница 430: ...E ELECTRICAL COMPONENT Left side view 1 Fuel enrichment valve B Black L Blue 8 3 ...
Страница 470: ...E CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 TROUBLE SHOOTING FOR PEAK VOLTAGE 9 3 ...
Страница 486: ......
Страница 488: ...Printed on recycled paper Printed in JAPAN Apr 2000 1 7 x 1 SY E60HMHD E60HWHD E60HWD YAMAHA MOTOR CO LTD ...