E
CHAPTER 3
PERIODIC CHECK AND ADJUSTMENT
MAINTENANCE INTERVAL CHART ...............................................................3- 1
CHECKING THE TOP COWLING FIT ........................................................3- 2
CHECKING THE FUEL LINE ......................................................................3- 3
CHECKING THE FUEL FILTER ..................................................................3- 4
ADJUSTING THE IGNITION TIMING .......................................................3- 5
SYNCHRONIZING THE CARBURETOR....................................................3- 8
ADJUSTING THE PILOT SCREW .............................................................3- 9
ADJUSTING THE ENGINE IDLING SPEED ............................................3- 10
ADJUSTING THE THROTTLE LINK........................................................3- 11
ADJUSTING THE PICK UP TIMING .......................................................3- 12
ADJUSTING THE START-IN-GEAR PROTECTION DEVICE..................3- 12
ADJUSTING THE THROTTLE CABLE (E60HMHD/E60MH,
E60HWHD/E60EH) ...................................................................................3- 13
ADJUSTING THE THROTTLE CABLE (E60HWD) ..................................3- 15
ADJUSTING THE SHIFT CABLE (E60HMHD/E60MH,
E60HWHD/E60EH) ...................................................................................3- 17
ADJUSTING THE SHIFT CABLE (E60HWD) ..........................................3- 19
CHECKING THE GEAR OIL LEVEL .........................................................3- 21
CHANGING AND CHECKING THE GEAR OIL LEVEL............................3- 21
CHECKING THE LOWER UNIT (FOR AIR LEAKS) .................................3- 22
CHECKING THE ANODE .........................................................................3- 23
CHECKING THE BATTERY......................................................................3- 23
CHECKING THE SPARK PLUGS .............................................................3- 24
LUBRICATION POINTS...........................................................................3- 26
Содержание 55BET 55DEHD E60HMHD
Страница 84: ...E DIMENSIONS DIMENSIONS OUTBOARD DIMENSIONS 2 8 ...
Страница 86: ...F DIMENSIONS DIMENSIONS DIMENSIONS HORS TOUT 2 8 ...
Страница 88: ...D ABMESSUNGEN ABMESSUNGEN ABMESSUNGEN DES AUSSENBORDMOTORS 2 8 ...
Страница 90: ...ES DIMENSIONES DIMENSIONES DIMENSIONES DEL FUERA BORDA 2 8 ...
Страница 92: ...E DIMENSIONS BRACKET DIMENSIONS 2 10 ...
Страница 94: ...F DIMENSIONS DIMENSIONS DU SUPPORT 2 10 ...
Страница 96: ...D ABMESSUNGEN ABMESSUNGEN DER HALTERUNG 2 10 ...
Страница 98: ...ES DIMENSIONES DIMENSIONES DEL SOPORTE 2 10 ...
Страница 110: ...FUEL SYSTEM E FUEL SYSTEM CHECKING THE FUEL LINE 1 Fuel joint 2 Fuel filter 3 Fuel pump 4 Carburetor 3 3 ...
Страница 134: ...E CONTROL SYSTEM ADJUSTING THE THROTTLE CABLE E60HWD 1 Throttle cable 2 Throttle control lever 3 15 ...
Страница 138: ...E CONTROL SYSTEM ADJUSTING THE SHIFT CABLE E60HMHD E60MH E60HWHD E60EH 1 Shift lever 2 Shift rod 3 Shift actuator 3 17 ...
Страница 142: ...E CONTROL SYSTEM ADJUSTING THE SHIFT CABLE E60HWD 1 Shift cable 2 Shift actuator 3 19 ...
Страница 158: ...GENERAL E 3 27 ...
Страница 159: ...GENERAL ES ALLGEMEINES D GENERALITES F 3 27 ...
Страница 162: ...FUEL LINE E FUEL LINE 1 Fuel joint 2 Fuel filter 3 Fuel pump 4 Carburetor 4 1 ...
Страница 198: ...E RECOIL STARTER ASSEMBLY Step Job Part Q ty Remarks 14 Bushing 6 For installation reverse the removal procedure 5 2 ...
Страница 408: ...UPPER CASE ASSEMBLY E REMOVING THE GROUND LEAD Remove Ground lead NOTE Remove the lead at three different points 7 17 ...
Страница 430: ...E ELECTRICAL COMPONENT Left side view 1 Fuel enrichment valve B Black L Blue 8 3 ...
Страница 470: ...E CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 TROUBLE SHOOTING FOR PEAK VOLTAGE 9 3 ...
Страница 486: ......
Страница 488: ...Printed on recycled paper Printed in JAPAN Apr 2000 1 7 x 1 SY E60HMHD E60HWHD E60HWD YAMAHA MOTOR CO LTD ...