![Mitsubishi MOTORS Eclipse Скачать руководство пользователя страница 601](http://html1.mh-extra.com/html/mitsubishi-motors/eclipse/eclipse_manual_1812184601.webp)
MULTIPORT FUEL INJECTION (MFI) DIAGNOSIS
TSB Revision
MULTIPORT FUEL INJECTION (MFI) <3.0L>
13B-601
STEP 3. Check connector B-45 at generator connector for
damage.
Q: Is the connector in good condition?
YES :
Go to Step 4.
NO :
Repair or replace it. Refer to GROUP 00E, Harness
Connector Inspection
. Then confirm that the
malfunction symptom is eliminated.
STEP 4. Check connector C-51 at ECM <M/T> or connector
C-52 at PCM <A/T> for damage.
Q: Is the connector in good condition?
YES :
Go to Step 5.
NO :
Repair or replace it. Refer to GROUP 00E, Harness
Connector Inspection
. Then confirm that the
malfunction symptom is eliminated.
STEP 5. Check for open circuit and short circuit to ground
and harness damage between generator connector B-45
terminal 1 and ECM connector C-51 terminal 8 <M/T> or
PCM connector C-52 terminal 8 <A/T>.
NOTE: Check harness after checking intermediate connector
B-13. If intermediate connector is damaged, repair or replace
them. Refer to GROUP 00E, Harness Connector Inspection
. Then check that the malfunction is eliminated.
Q: Is the harness wire in good condition?
YES :
Replace the ECM or PCM. Then confirm that the
malfunction symptom is eliminated.
NO :
Repair it. Then confirm that the malfunction symptom
is eliminated.
AK000735AB
CONNECTOR:B-45
AK000225
CONNECTOR : C-51<M/T>, C-52<A/T>
C-52
C-51
PCM<A/T>
ECM<M/T>
AJ
AK000735AB
CONNECTOR:B-45
AK000225
CONNECTOR : C-51<M/T>, C-52<A/T>
C-52
C-51
PCM<A/T>
ECM<M/T>
AJ