![Mitsubishi MOTORS Eclipse Скачать руководство пользователя страница 407](http://html1.mh-extra.com/html/mitsubishi-motors/eclipse/eclipse_manual_1812184407.webp)
MULTIPORT FUEL INJECTION (MFI) DIAGNOSIS
TSB Revision
MULTIPORT FUEL INJECTION (MFI) <3.0L>
13B-407
STEP 7. Check the 5-volt supply circuit voltage at ECM
connector C-58 <M/T> or PCM connector C-55 <A/T> by
backprobing.
(1) Do not disconnect ECM connector C-58 <M/T> or PCM
connector C-55 <A/T>.
(2) Turn the ignition switch to the "ON" position.
(3) Measure the voltage between terminal 42 <M/T> or terminal
46 <A/T> and ground by backprobing.
•
Voltage should be between 4.8 and 5.2 volts.
(4) Turn the ignition switch to the "LOCK" (OFF) position.
Q: Is the voltage normal?
YES :
Go to Step 9.
NO :
Go to Step 8.
STEP 8. Check connector C-58 at ECM <M/T> or C-55 at
PCM <A/T> for damage.
Q: Is the connector in good condition?
YES :
Go to Step 21.
NO :
Repair or replace it. Refer to GROUP 00E, Harness
Connector Inspection
AC002083AC
HARNESS SIDE
CONNECTOR
<M/T> C-58
<A/T> C-55
AC001689
CONNECTOR: C-58 <M/T>, C-55 <A/T>
ECM <M/T>
OR
PCM <A/T>
C-58
<M/T>
C-55
<A/T>
AO