MULTIPORT FUEL INJECTION (MFI) DIAGNOSIS
TSB Revision
MULTIPORT FUEL INJECTION (MFI) <3.0L>
13B-425
STEP 10. Check the harness wire between ECM connector
C-58 terminal 42 <M/T> or PCM connector C-55 terminal 46
<A/T> and intermediate connector D-16 terminal No.8 for
damage.
Q: Is the harness wire in good condition?
YES :
Go to Step 22.
NO :
Repair it. Then go to 22.
STEP 11. Check the circuit voltage at intermediate
connector D-16.
(1) Use special tools (MB991658 and MB991709) to connect
terminals 5 and 8 between connectors of the intermediate
connector D-16 respectively.
(2) Turn the ignition switch to the "ON" position.
(3) Measure the voltage at the male side connector between
terminal 6 and ground.
•
Voltage should be between 0.5 and 4.8 volts.
(4) Turn the ignition switch to the "LOCK" (OFF) position.
(5) Remove the special tools and connect intermediate
connector D-16.
Q: Is the voltage normal?
YES :
Go to Step 12.
NO :
Go to Step 15.
AC001689
CONNECTOR: C-58 <M/T>, C-55 <A/T>
ECM <M/T>
OR
PCM <A/T>
C-58
<M/T>
C-55
<A/T>
AO
AC001787AD
CONNECTOR: D-16
AC106525
AB
MB991709
MB991658
INTERMEDIATE
CONNECTOR D-16
INTERMEDIATE
CONNECTOR D-16
AC106528
1
2 3 4 5 6
7
8
9
10
AB
INTERMEDIATE
CONNECTOR D-16
MALE SIDE
CONNECTOR