59
3/4” Bolts (Cab End)
3/4” Bolts (Engine End)
3/4” Bolts
3/4” Bolts
Anchor Support & Pivot Bolt
Bolt & Roller
Anchor Support
Cable Pulley Under Tunnel Floor
Pulley
Anchor Cable
11. Assemble the tunnel support weldment
plates between the left and right tunnel
mounts and the coresponding holes in the
frame of the bagger on the engine and
cab ends. Use 5/8-11 x 1-1/2 hex bolts
5/8-11 nylon loc
k flange nuts to secure
the weldments to the tunnel mounts and
the frame. On the cab end of the tunnel,
also assemble the anchor indicator cable
roller to the lower bolt of the tunnel mount.
Tighten securely.
12. Assemble the tunnel floor to the frame us-
ing the 5/8-11 x 1-1/2 bolts inserted from
the top down. Secure in place with 5/8-11
hex nuts. Tighten securely.
13. Under the tunnel assemble the 3/4-10 x
3 flange bolts between the tunnel and the
frame. Secure in place with 3/4-10 nylok
nuts. Tighten securely.
14. Place the anchor cables around the cable
pullies under the tunnel and insert the
retainer pin next to the pulley.
15. Assemble the anchor supports with pivot
bolts to the tunnel.
Retainer Pin In This Area
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...