60
16. Assemble the anchors to the anchor
cables using the two piece anchor retain-
ers. Tighten securely to hold the retainer
halves together.
17. Assemble the hydraulic hoses quick dis-
connects for the tunnel cleanout plate to
the control valve on the valve plate mount-
ed to the cab side of the tunnel. Tighten
securely.
18. Assemble the engine end hand rail to
the corner of the hydraulic oil tank at the
engine end. Place the hand rail mounting
plate against the hydraulic oil tank, line up
the three mounting holes and insert the
3/8-16 x 1-1/4 stainless steel bolts with 3/8
stainless steel flat washers through the
hand rail plate and then the hydraulic oil
tank lip. Secure in place with 3/8 stain-
less steel flat washers and 3/8-16 stainless
steel nylock lock nuts. Tighten securely.
19. Assemble the cab end hand rail to the
hand rail at the cab end of the bag-
ger. This hand rail is used to fill the gap
between the platform hand rail and the
tunnel. Position the handrail next to the
platform hand rail from the tunnel side. Se-
cure the hand rail to the platform hand rail
with four 5/16 x 1-1/2 round stainless steel
u-bolts. Place the u-bolts around the rail-
ing tubes and through the mounting plates.
Secure in place with 5/16 stainless steel
flat washers and 5/16-18 stainless steel
nylock nuts. Position to fill as much of the
gap as possible and tighten securely.
20. When the tunnel is completely assembled
to the bagger, remove the overhead hoist
from the top of the tunnel. Be sure to fold
the lifting loop down against the tunnel to
prevent damage to the bag.
21. Reverse the installation procedure to re-
move the 12 ft tunnel.
22. Be sure to set the tunnel on blocks on a
level flat surface when not in use.
Engine End Hand Rail
Hand Rail
Cab End Hand Rail
Bolts, Washers
& Nuts
Hand Rail
U-Bolts, Wash-
ers & Nuts
Platform Hand
Rail Tube
Two Piece Cable Retainers (Lower Shown)
Lower Retainer Halves
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...