55
3/4” Bolts (Cab End)
3/4” Bolts (Engine End)
Planetary Guard
Allen Flat Head Bolts Early Production or
Hex Head Bolts Current Production (Cab End
Shown)
9.
Remove the guard from the planetary end
of the rotor on the feed table side. This is
to access the three allen flat head bolts
(inline with the rotor) that hold the tunnel to
the frame. Remove all three bolts. Save
all hardware for reassembly. Note: early
production had flat head bolts, current pro-
duction has hex head bolts.
8.
Remove the seven 3/4” bolts from under
the tunnel. These bolts hold the tunnel to
the frame. Three are on the cab end of the
tunnel and four are on the engine end of
the tunnel. Save the hardware for reas-
sembly.
3/4” Bolts
3/4” Bolts
Planetary
Guard
Flat Hd Bolts (Early Production Shown)
Current Production Has Hex Head Bolts
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...