53
Changing Tunnels
The tunnel on this bagger can be changed to ac-
commodate either a 12 foot bag or a 14 foot bag.
Remove 14 foot Tunnel
The 14 foot tunnel weighs approximately 5190
lbs (2354 kg).
You will require a overhead crane with a lifting
capacity of at least 3 Ton
DANGER
NEVER attempt to lift or move the tunnel with
the bag cradle boom. Always use a overhead
crane to remove or install the tunnel. Seri-
ous injury or death will result from the tunnel
falling and creating a crushing hazard.
DANGER
The tunnel and components are heavy. To
avoid serious injury or death, be sure the lift
and straps are capable of lifting and sup-
porting the tunnel with cleanout door and
hydraulic cylinders.
To change the tunnel proceed as follows.
1.
Start the engine and lower the bag pan
all the way down. Shut off the engine and
remove the key.
Bag Pan Lowered
Crane Attached To Tunnel Loop
Two Piece Cable Retainers (Lower Shown)
4.
Remove the anchors from the anchor
cable by removing the two piece cable
retainers on each side of the anchor. Save
all items for reassembly.
2.
Remove the tunnel extension from the
tunnel. Set the tunnel extension out of the
way. Save all mounting hardware. Re-
move the bag cradle from the tunnel.
3.
Securely attach the overhead crane to the
flip up loop on the top of the tunnel. Put
slight tension on the crane, but not to the
extent that you start lifting on the tunnel.
Do not use the bag boom to remove the
tunnel. Attach the overhead crane to the
flip up loop only. Do not attach the crane
to any other points on the tunnel.
Flip Up Loop
Lower Retainer Halves
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...