54
Anchor Support & Pivot Bolt
Cable Pulley Under Tunnel Floor
Button Head Bolts In Tunnel Floor
7.
Remove the 9 button head bolts (located
behind the cleanout plate) securing the
tunnel floor to the frame. Save the button
head bolts and nuts for reassembly.
6.
Pull the two anchor cables through the
pullies under the tunnel floor. Remove the
cable retainer pin next to the pulley. Save
the pin for reassembly.
5.
Remove the bolt holding the anchor sup-
ports with rollers from the tunnel.
Bolt & Roller
Anchor Support
Pulley
Button Hd Bolts
Anchor Cable
Remove Retainer
Pin From This Area
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...