78
Prepare The Bagger For
Transport
Feed Table
Before raising the feed table up, the feed table
sides have to be folded down onto the feed table
belt.
1.
Unhook the bungee cords from each side
panel holding the front rub
ber flap in place.
Pull the rubber flap outside the side panels.
Feed Table Lock
Side Panel Lock
Front Rubber Flap Bungee Cord
Lock Handle
Panel Lock
Bungee Cord
Unhook Here
2.
Unlock the side panels one at a time and
lower the side panels down on the feed
table belt. Be sure the front rubber flap
remains out from under the side panels.
4.
Once the side panels are both down and
latched, raise the feed table up to the
transport position and lock in place with
the transport lock. Be sure the transport
lock is fully engaging the feed table.
Bag Cradle
The bag cradle is stored on top of the tunnel
before the tunnel extension is pinned in place.
1.
Use the bag boom to lift the bag cradle up
and set on top of the tunnel. Be sure the
cradle is centered from side to side on the
tunnel and between the pipes on the tun-
nel.
2.
Unhook the bag boom from the cradle
when in position.
Bag Cradle In Transport Position
3.
Latch the panels together to hold them in
place while raising the feed table.
Side Panels Latched Together
Latch
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...