77
Venting The Bag
Immediately after the bag is sealed a vent must
be installed to remove the gases produced by
the product. A reusable vent valve and vent tool
are available from your Miller Ag-Bag dealer.
Reusable Vent Valve Part Number 42.1500893
Vent Installation Tool Part Number 42.1500568
Insert the vent valve as follows:
1.
Remove the cover from the vent cutter tool.
Turn the cutting portion of the tool around
(cutter away from cover), line up the notch-
es and insert the cutter into the cover.
2.
Take the threaded side of the valve, line up
the notches and slide it over the cutter end
of the tool. Slide the threaded portion all
the way onto the cutter.
Slide the lid of the vent open enough to allow the
gases to escape. Within 1-2 days, close the lid
and leave the vent in the bag until that end of the
bag is fed out.
NOTE:
If excessive gassing occurs, leave the
vent open an additional day. If the bag puffs
up again after closing the valve, open the valve
again until gasses recede, then close the valve.
4.
Assemble the valve lid onto the threaded
portion. Turn the lid to the left and tighten
securely.
3.
After you have located the spot where you
want the vent to be installed, about 10 feet
from the end and about 3/4 of the way up
the height of the bag, press the cutter por-
tion of the tool into the plastic to create a
hole. Push the tool with the threaded por-
tion of the vent through the hole and pull
the cutting tool out leaving the threaded
end of the vent sticking out through the
bag.
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...