64
Setup Bagger For Bagging
Operation
Pintle Hitch
The pintle hitch on this bagger is used for towing
the bagger on the road from job site to job site.
The hitch must be removed from the transport
tube and placed in the stored position of the
tube closest to the lift jack before any bagging
operation is started.
Hitch In Stored Position
Brace In Stored Position
The pintle hitch brace should be removed from
between the tow hitch and bagger frame and
stored on the two storage tabs, one by each cab
end wheel. Use the existing pins to secure in
place.
Position Bagger At Bagging Site
Drive the bagger to the spot where the bag is
to begin. Position the bagger with the tunnel to-
ward the bag starting point. Position the bagger
perpendicular to the path of the bag.
Switch Wheels From Trailer or Transport
Mode to Bagging Mode:
1.
Lower the cab end lift jack enough to
slightly lift the wheels.
2.
Press the “Align” switch on the switch
panel on the right side corner post.
3.
Steer the wheels to 90 degrees ± 2 de-
grees.
4.
Lower the cab end wheels to the ground by
lifting the jack all the way up.
5.
Lower the engine end lift jack enough to
slightly lift the wheels.
Align and Drive Switch
Press This End For Align
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...