57
“A” & “B” Port Hose Quick Disconnects On
Valve Block
Plate On Upper Tunnel (Cab Side)
Plate On Upper Tunnel (Engine Side)
Tunnel Removed From Frame
15. Locate the plate on the engine side of the
upper tunnel that holds the tunnel to the
frame. Loosen the five bolts from one end
of the plate and remove the four bolts from
the other end of the plate. Save all hard-
ware for reassembly.
16. Use the overhead crane to slowly lift and
remove the tunnel with cleanout door and
hydraulic cylinders from the frame. Set the
tunnel down on wood blocks making sure
that the tunnel is stable.
14. Locate the plate on the cab side of the
upper tunnel that holds the tunnel to the
frame. Loosen the five bolts from one end
of the plate and remove the four bolts from
the other end of the plate. Save all hard-
ware for reassembly.
13. Identify and remove the two quick discon-
nect hoses from the “A” & “B” ports on the
valve block mounted to the tunnel on the
feed table side just infront of the cab. The
valve and hoses from the “C” & “D” ports
remain with the tunnel. Valve block shown
is on a 12 foot tunnel, valve & hoses are
the same as a 14 foot tunnel, just mounted
different.
Valve Block
Plate
Four Bolts
Five Bolts
Five Bolts
Plate
Four Bolts
“B” Port
Hose
17. Reverse the removal procedure to install
the 14 foot tunnel.
“A” Port
Hose
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...