56
Bolts between Tunnel Support Pipes
Limit Switch & Wire Harness
12. Remove the wire harness from the limit
switch located on the tunnel side behind
the cleanout plate. The limit switch can
remain with the tunnel.
11. Remove the nine bolts from each side of
the tunnel (between the tunnel support
pipes). The bottom four on each side have
spacers to the inside. Save all hardware
for reassembly. Lower four bolts shown.
Chain Guard
10. Remove the guard over the chains at the
driven end of the rotor on the feed table
side.
This is to access the three allen flat
head bolts (inline with the rotor) that hold
the tunnel to the frame. Remove all three
bolts. Save all hardware for reassembly.
Note: early production had flat head bolts,
current production has hex head bolts.
Chain Guard
Bolts
Support
Pipes
Limit Switch &
Harness
Allen Flat Head Bolts Early Production or
Hex Head Bolts Current Production (Cab End
Shown)
Flat Hd Bolts (Early Production Shown)
Current Production Has Hex Head Bolts
Содержание AG-BAG Professional LX1214
Страница 20: ...14 Safety Sign and Decal Locations...
Страница 21: ...15 Safety Sign and Decal Locations continued...
Страница 128: ...122 Maintenance Record Date Service Performed...
Страница 129: ...123 Date Service Performed...
Страница 130: ...124 Date Service Performed...
Страница 158: ...2014 by Miller St Nazianz Inc...