Output Connections
Sense Connections
Ensure that the sense cable is installed on the back of the instrument as shown. The only time the
sense cable should be disconnected from the output bus bars is when
.
Models N6914xA
Models N6917xA
If the sense cable is not installed prior to instrument turn-on or becomes disconnected, the unit will
continue to operate. The open-circuit voltage will now be higher at the output terminals than the
programmed value because the regulation point is now maintained through internal sense-protect
resistors. The actual voltage at the output terminals will be higher by the percent shown below, even
though the readback voltage will still reflect the programmed value.
Model
Δ
Gain percent
Model
Δ
Gain percent
N69143A *
0 %
N69172A
+ 1 %
N69145A
+ 0.54 %
N69173A
+ 1.65 %
N69146A
+ 0.27 %
* For the 20 V APS unit only, the sense leads are buffered so that there is virtually no change in the open-circuit output
voltage if the sense cable is not installed or becomes disconnected.
Bus Bar Connections
SHOCK HAZARD, LETHAL VOLTAGES - Some models generate output voltages up to
2,000 VDC! Ensure that all instrument connections, load wiring, load and sense
connections are insulated using high-voltage wire. Always attach the safety cover
provided, so that no accidental contact with lethal voltages can occur.
The following factors should be considered when wiring the load to the power supply:
l
Load wire temperature, current carrying capacity, and voltage drop
l
Load and sense wire insulation rating must be equivalent to the output voltage rating
l
Load wire noise and impedance effect
2 Installing the Instrument
62
Keysight N69100 Series Operating and Service Guide
Содержание N69100 Series
Страница 1: ...Keysight Advanced Power System DC Power Supply N69100 Series Operating and Service Guide...
Страница 2: ......
Страница 14: ......
Страница 50: ...Outline Diagram for 10 kW Models 1 Quick Reference 50 Keysight N69100 Series Operating and Service Guide...
Страница 51: ...Outline Diagram for 20 kW Models Keysight N69100 Series Operating and Service Guide 51 1 Quick Reference...
Страница 52: ......
Страница 80: ......
Страница 94: ......
Страница 210: ...Status Diagram 5 SCPI Programming Reference 210 Keysight N69100 Series Operating and Service Guide...
Страница 212: ...Trigger Diagram 5 SCPI Programming Reference 212 Keysight N69100 Series Operating and Service Guide...
Страница 230: ...Models N69172A and N69173A 6 Verification and Calibration 230 Keysight N69100 Series Operating and Service Guide...
Страница 244: ......