![Keysight Technologies N69100 Series Скачать руководство пользователя страница 253](http://html1.mh-extra.com/html/keysight-technologies/n69100-series/n69100-series_operating-and-service-manual_1962218253.webp)
5. Use a flat-bladed screwdriver and carefully pry up on the side of the battery indicated by the
arrow.
6. Install the new battery. Make sure that the positive side (+) is facing up. Place the battery
under
the small spring clips indicated by the circle, then push down on the opposite end of the battery
indicated by the red arrow. The top of the small spring clips should be visible after the battery is
seated (see red circle).
7. Replace the ribbon cables by fully inserting the cables into the connector; then pushing down on
the locking tab to secure the cables.
8. Replace the Control board and top cover when finished. When reassembling, torque all screws to
9 in-lbs.
9. Reset the date and time (see
).
Keysight N69100 Series Operating and Service Guide
253
7 Service and Maintenance
Содержание N69100 Series
Страница 1: ...Keysight Advanced Power System DC Power Supply N69100 Series Operating and Service Guide...
Страница 2: ......
Страница 14: ......
Страница 50: ...Outline Diagram for 10 kW Models 1 Quick Reference 50 Keysight N69100 Series Operating and Service Guide...
Страница 51: ...Outline Diagram for 20 kW Models Keysight N69100 Series Operating and Service Guide 51 1 Quick Reference...
Страница 52: ......
Страница 80: ......
Страница 94: ......
Страница 210: ...Status Diagram 5 SCPI Programming Reference 210 Keysight N69100 Series Operating and Service Guide...
Страница 212: ...Trigger Diagram 5 SCPI Programming Reference 212 Keysight N69100 Series Operating and Service Guide...
Страница 230: ...Models N69172A and N69173A 6 Verification and Calibration 230 Keysight N69100 Series Operating and Service Guide...
Страница 244: ......