1-4
MM2 Motor Manager 2
GE Power Management
1.3 SPECIFICATIONS
1 INTRODUCTION
1
1.3 SPECIFICATIONS
1.3.1 MM2 SPECIFICATIONS
Design and specifications are subject to change without notice.
PHASE CURRENT INPUTS
CONVERSION:
true RMS, sample time 1.67ms
RANGE:
0.1 to 8
×
PHASE CT PRIMARY AMPS
setpoint
FULL SCALE:
8
×
PHASE CT PRIMARY AMPS
setpoint
ACCURACY:
±2% of
PHASE CT PRIMARY AMPS
setpoint or ±2% of reading, whichever is greater
GROUND FAULT CURRENT INPUT
CONVERSION:
true RMS, sample time 1.67 ms
RANGE:
0.1 to 1.0
×
G/F CT PRIMARY AMPS
setpoint (for 5 A secondary CT)
0.5 to 15.0 A (for 50:0.025 CT)
FULL SCALE:
1.5
×
G/F CT PRIMARY AMPS
setpoint (for 5 A secondary CT)
15 A (for 50:0.025 CT)
ACCURACY:
for 5A CT: ±2% of full scale (5A CT)
for 50:0.025 CT: ±0.10 A (0.0 to 3.99 A)
±0.20 A (4.00 to 15.00 A)
VOLTAGE INPUT / POWER READING
CONVERSION:
true RMS, sample time 1.67ms
VOLTAGE FULL SCALE:
1.5
×
VT Primary
VOLTAGE ACCURACY:
±2% of VT Primary or ±2% of reading, whichever is greater
POWER ACCURACY:
±5% of nominal or ±5% of reading, whichever is greater
INPUT VOLTAGE:
Nominal: 120 V AC or 110 V AC
Maximum: 150 V AC
VT BURDEN:
0.01 VA
OVERLOAD CURVES
TRIP TIME ACCURACY:
±200 ms up to 10 seconds
±2% of trip time over 10 seconds
DETECTION LEVEL:
± 1% of primary CT amps
GROUND FAULT TRIP TIME
ACCURACY:
–0 ms / +50 ms, 0.0 = less than 50 ms
ACCELERATION TIME
RANGE:
0.5 to 125 seconds or OFF
ACCURACY:
±0.5 seconds
SINGLE PHASE
RANGE:
greater than 30% U/B
ACCURACY:
± 2 percentage points
TRIP DELAY:
5 seconds ± 1 second
NOTE
Содержание MOTOR MANAGER 2
Страница 2: ......
Страница 4: ......
Страница 21: ...GE Power Management MM2 Motor Manager 2 2 3 2 INSTALLATION 2 1 MOUNTING 2 Figure 2 4 TYPICAL WIRING DIAGRAM ...
Страница 33: ...GE Power Management MM2 Motor Manager 2 3 7 3 HARDWARE 3 3 THEORY OF OPERATION 3 Figure 3 2 BLOCK DIAGRAM ...
Страница 34: ...3 8 MM2 Motor Manager 2 GE Power Management 3 3 THEORY OF OPERATION 3 HARDWARE 3 ...
Страница 80: ...5 12 MM2 Motor Manager 2 GE Power Management 5 5 A4 STATISTICS 5 ACTUAL VALUES 5 ...
Страница 130: ...7 2 MM2 Motor Manager 2 GE Power Management 7 1 INJECTION TESTING 7 TESTING 7 Figure 7 1 SECONDARY INJECTION TEST SETUP ...
Страница 153: ...GE Power Management MM2 Motor Manager 2 9 5 9 STARTER TYPES 9 2 FV REVERSING STARTER 9 Figure 9 4 FV REVERSING STARTER ...
Страница 161: ...GE Power Management MM2 Motor Manager 2 9 13 9 STARTER TYPES 9 4 SLIP RING STARTER 9 Figure 9 10 SLIP RING STARTER ...
Страница 187: ...GE Power Management MM2 Motor Manager 2 9 39 9 STARTER TYPES 9 13 SOFT STARTER 9 Figure 9 25 SOFT STARTER ...
Страница 188: ...9 40 MM2 Motor Manager 2 GE Power Management 9 13 SOFT STARTER 9 STARTER TYPES 9 ...
Страница 212: ...E 4 MM2 Motor Manager 2 GE Power Management E 1 CT ISOLATION APPENDIXE E ...
Страница 220: ...iv MM2 Motor Manager 2 GE Power Management INDEX ...