8-6
MM2 Motor Manager 2
GE Power Management
8.3 CONFIGURATION
8 MM2PC
®
SOFTWARE
8
8.3.2 MM2PC
®
PROGRAM MENUS
Figure 8–3: MM2PC
®
MENU STRUCTURE
Create a new setpoint file with factory defaults
Edit file properties firmware
Save the file to an existing or new name
Open an existing file
Print the MM2 o
r file setpoints
Display a preview on screen
Change the printer settings
Send setpoint file information to the MM3
Exit the MM2PC program
Enable/disable setpoint access
Change user map related values
Change testing related setpoints
Change monitoring related setpoints
Change auto restart and auxiliary control setpoints
Change process related setpoints
Change protection related setpoints
Change system setup setpoints
View motor, process, and trip data
View dynamic trending graphs
View counters and timers
View switch inputs status
View status of all MM2 input
s and outputs
View MM2 produc
t information
Set computer communications parameters
Upgrade MM2 firmware
Troubleshoot memory map locations
Store new address to chassis mount MM2
Modem control options
Enable/disable confirm store dialog box
Display MM2 instructio
n manual as a help file
Display MM2 progra
m information
Display instructions on using Windows Help
Opens the Help Window
Create a new file
Opens an existing file
Saves the file
Sends current file to the printer
Sets the computer communication parameters
Dial
Hang up
807699A2.CDR
Содержание MOTOR MANAGER 2
Страница 2: ......
Страница 4: ......
Страница 21: ...GE Power Management MM2 Motor Manager 2 2 3 2 INSTALLATION 2 1 MOUNTING 2 Figure 2 4 TYPICAL WIRING DIAGRAM ...
Страница 33: ...GE Power Management MM2 Motor Manager 2 3 7 3 HARDWARE 3 3 THEORY OF OPERATION 3 Figure 3 2 BLOCK DIAGRAM ...
Страница 34: ...3 8 MM2 Motor Manager 2 GE Power Management 3 3 THEORY OF OPERATION 3 HARDWARE 3 ...
Страница 80: ...5 12 MM2 Motor Manager 2 GE Power Management 5 5 A4 STATISTICS 5 ACTUAL VALUES 5 ...
Страница 130: ...7 2 MM2 Motor Manager 2 GE Power Management 7 1 INJECTION TESTING 7 TESTING 7 Figure 7 1 SECONDARY INJECTION TEST SETUP ...
Страница 153: ...GE Power Management MM2 Motor Manager 2 9 5 9 STARTER TYPES 9 2 FV REVERSING STARTER 9 Figure 9 4 FV REVERSING STARTER ...
Страница 161: ...GE Power Management MM2 Motor Manager 2 9 13 9 STARTER TYPES 9 4 SLIP RING STARTER 9 Figure 9 10 SLIP RING STARTER ...
Страница 187: ...GE Power Management MM2 Motor Manager 2 9 39 9 STARTER TYPES 9 13 SOFT STARTER 9 Figure 9 25 SOFT STARTER ...
Страница 188: ...9 40 MM2 Motor Manager 2 GE Power Management 9 13 SOFT STARTER 9 STARTER TYPES 9 ...
Страница 212: ...E 4 MM2 Motor Manager 2 GE Power Management E 1 CT ISOLATION APPENDIXE E ...
Страница 220: ...iv MM2 Motor Manager 2 GE Power Management INDEX ...