GE Power Management
MM2 Motor Manager 2
F-1
APPENDIX F
F.1 LISTS
F
APPENDIX F FIGURES AND TABLESF.1 LISTS
F.1.1 LIST OF FIGURES
F
IGURE
2–1: MM2 MOUNTING INSTRUCTIONS ...................................................................... 2-1
F
IGURE
2–2: MM2 DIMENSIONS ............................................................................................... 2-2
F
IGURE
2–3: MM2 WITH DEPTH REDUCTION COLLAR DIMENSIONS.................................. 2-2
F
IGURE
2–4: TYPICAL WIRING DIAGRAM ............................................................................... 2-3
F
IGURE
2–5: MM2 FUNCTIONAL BLOCK DIAGRAM................................................................ 2-4
F
IGURE
2–6: RS485 TERMINATION .......................................................................................... 2-7
F
IGURE
3–1: FRONT PANEL ..................................................................................................... 3-1
F
IGURE
3–2: BLOCK DIAGRAM................................................................................................. 3-7
F
IGURE
4–1: SETPOINTS MESSAGES ..................................................................................... 4-2
F
IGURE
4–2: GE POWER MANAGEMENT TIME/OVERCURRENT CURVES.......................... 4-9
F
IGURE
4–3: NEMA COMPATIBLE TIME/OVERCURRENT CURVES.................................... 4-11
F
IGURE
5–1: MESSAGE SUMMARY ......................................................................................... 5-2
F
IGURE
7–1: SECONDARY INJECTION TEST SETUP............................................................. 7-2
F
IGURE
8–1: GE POWER MANAGEMENT WELCOME SCREEN ............................................ 8-3
F
IGURE
8–2: COMMUNICATION / COMPUTER WINDOW ....................................................... 8-4
F
IGURE
8–3: MM2PC
®
MENU STRUCTURE............................................................................. 8-6
F
IGURE
8–4: TRENDING VIEW................................................................................................ 8-12
F
IGURE
9–1: FULL-VOLTAGE NON-REVERSING ELEMENTARY STARTER ......................... 9-1
F
IGURE
9–2: FV NON-REVERSING STARTER WIRING DIAGRAM......................................... 9-2
F
IGURE
9–3: FULL VOLTAGE REVERSING STARTER ............................................................ 9-3
F
IGURE
9–4: FV REVERSING STARTER .................................................................................. 9-5
F
IGURE
9–5: ELEMENTARY TWO SPEED MAGNETIC STARTER .......................................... 9-6
F
IGURE
9–6: TWO SPEED ONE WINDING CONSTANT OR VARIABLE TORQUE STARTER 9-8
F
IGURE
9–7: TWO SPEED ONE WINDING CONSTANT HORSEPOWER STARTER ............. 9-9
F
IGURE
9–8: TWO SPEED TWO WINDING STARTER ........................................................... 9-10
F
IGURE
9–9: ELEMENTARY SLIP RING MAGNETIC STARTER............................................ 9-11
F
IGURE
9–10: SLIP RING STARTER ....................................................................................... 9-13
F
IGURE
9–11: ELEMENTARY PRIMARY RESISTANCE MAGNETIC STARTER ................... 9-14
F
IGURE
9–12: PRIMARY RESISTANCE STARTER ................................................................ 9-16
F
IGURE
9–13: ELEMENTARY INVERTER STARTER ............................................................. 9-17
F
IGURE
9–14: INVERTER (VARIABLE SPEED DRIVE) STARTER ........................................ 9-19
F
IGURE
9–15: ELEMENTARY AUTOTRANSFORMER OPEN TRANSITION STARTER........ 9-20
F
IGURE
9–16: AUTOTRANSFORMER OPEN TRANSITION TWO WINDING ........................ 9-22
F
IGURE
9–17: AUTOTRANSFORMER OPEN TRANSITION THREE WINDING..................... 9-23
F
IGURE
9–18: ELEMENTARY AUTOTRANSFORMER CLOSED TRANSITION STARTER ... 9-24
F
IGURE
9–19: AUTOTRANSFORMER CLOSED TRANSITION TWO WINDING .................... 9-26
F
IGURE
9–20: AUTOTRANSFORMER CLOSED TRANSITION THREE WINDING ................ 9-27
F
IGURE
9–21: WYE-DELTA OPEN TRANSITION STARTER .................................................. 9-31
F
IGURE
9–22: ELEMENTARY WYE-DELTA CLOSED TRANSITION MAGENTIC STARTER 9-32
F
IGURE
9–23: WYE-DELTA CLOSED TRANSITION STARTER ............................................. 9-34
F
IGURE
9–24: DUTY/STANDBY STARTER ............................................................................. 9-37
F
IGURE
9–25: SOFT STARTER ............................................................................................... 9-39
F
IGURE
10–1: TWO WIRE CONTROL ..................................................................................... 10-2
F
IGURE
10–2: HOA TWO-WIRE HAND / TWO-WIRE AUTO................................................... 10-4
F
IGURE
10–3: HOA THREE WIRE HAND / TWO WIRE AUTO ............................................... 10-6
F
IGURE
10–4: HOA THREE WIRE HAND / THREE WIRE AUTO ........................................... 10-8
F
IGURE
10–5: HA THREE WIRE HAND / TWO WIRE AUTO ................................................ 10-10
F
IGURE
D–1: CURRENT-VOLTAGE PHASE DIFFERENCE .....................................................D-1
Содержание MOTOR MANAGER 2
Страница 2: ......
Страница 4: ......
Страница 21: ...GE Power Management MM2 Motor Manager 2 2 3 2 INSTALLATION 2 1 MOUNTING 2 Figure 2 4 TYPICAL WIRING DIAGRAM ...
Страница 33: ...GE Power Management MM2 Motor Manager 2 3 7 3 HARDWARE 3 3 THEORY OF OPERATION 3 Figure 3 2 BLOCK DIAGRAM ...
Страница 34: ...3 8 MM2 Motor Manager 2 GE Power Management 3 3 THEORY OF OPERATION 3 HARDWARE 3 ...
Страница 80: ...5 12 MM2 Motor Manager 2 GE Power Management 5 5 A4 STATISTICS 5 ACTUAL VALUES 5 ...
Страница 130: ...7 2 MM2 Motor Manager 2 GE Power Management 7 1 INJECTION TESTING 7 TESTING 7 Figure 7 1 SECONDARY INJECTION TEST SETUP ...
Страница 153: ...GE Power Management MM2 Motor Manager 2 9 5 9 STARTER TYPES 9 2 FV REVERSING STARTER 9 Figure 9 4 FV REVERSING STARTER ...
Страница 161: ...GE Power Management MM2 Motor Manager 2 9 13 9 STARTER TYPES 9 4 SLIP RING STARTER 9 Figure 9 10 SLIP RING STARTER ...
Страница 187: ...GE Power Management MM2 Motor Manager 2 9 39 9 STARTER TYPES 9 13 SOFT STARTER 9 Figure 9 25 SOFT STARTER ...
Страница 188: ...9 40 MM2 Motor Manager 2 GE Power Management 9 13 SOFT STARTER 9 STARTER TYPES 9 ...
Страница 212: ...E 4 MM2 Motor Manager 2 GE Power Management E 1 CT ISOLATION APPENDIXE E ...
Страница 220: ...iv MM2 Motor Manager 2 GE Power Management INDEX ...