Power Failure Recovery
NetBlazer
561
When Using the Test Timer
When Using the Test Timer
Refer to
on page 279 for more information on test timer.
The test that was running will be re-created and started after a power
failure if conditions described above are met in addition with the following
test time conditions:
The start time has not expired during the power failure.
The stop time or the duration has not expired during the power failure.
Содержание FTB-1
Страница 1: ...User Guide FTB 700G 800 Series NetBlazer for FTB 1 ETHERNET AND MULTISERVICE TESTER...
Страница 12: ......
Страница 20: ......
Страница 22: ......
Страница 52: ......
Страница 59: ...Test Setup Test Applications NetBlazer 47 SONET SDH BERT For SDH BERT...
Страница 64: ...Test Setup Test Applications 52 FTB 700G 800 Series SONET SDH DSn PDH BERT For SDH...
Страница 84: ......
Страница 98: ......
Страница 298: ......
Страница 574: ......
Страница 604: ...Glossary 592 FTB 700G 800 Series Acronym List W WAN Wide Area Network WIS WAN Interface Sublayer WWN World Wide Name...
Страница 606: ...Glossary 594 FTB 700G 800 Series 10G Ethernet Client The following figure presents a typical network application...
Страница 619: ...Glossary NetBlazer 607 Ethernet Cables Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s...
Страница 646: ...Glossary 634 FTB 700G 800 Series SONET DSn SDH PDH The GUI Grid indicates the TUG 2 x and TUG 3 x values...
Страница 652: ......
Страница 674: ...0 5 1 5 48 5 0 176 W d y K y K D...