SiUS342303E
Part 5 Field Settings and Test Operation
148
1.1 Field Settings with Remote Controller ...................................................... 149
1.2 List of Field Settings for Indoor Unit ......................................................... 155
1.3 Applicable Field Settings .......................................................................... 157
1.4 Details of Field Settings for Indoor Unit.................................................... 161
1.5 Field Settings of Low-Temperature Hydrobox.......................................... 178
1.6 Gas Furnace Set Up................................................................................. 179
1.7 List of Field Settings for Outdoor-Air Processing Unit .............................. 180
1.8 Setting of Operation Control Mode........................................................... 180
2. Field Setting from Outdoor Unit...............................................................182
2.1 DIP Switch Setting when Mounting a Spare PCB .................................... 182
2.2 Accessing the BS Buttons on the PCB..................................................... 184
2.3 Operating the BS Buttons and DIP Switches on the PCB........................ 185
2.4 Monitoring Function and Field Settings .................................................... 188
2.5 Night-Time Low Noise Operation and Demand Operation....................... 210
2.6 Energy Saving and Optimum Operation................................................... 215
3.1 Precautions Before Starting Test Operation............................................. 218
3.2 Test Operation Procedure ........................................................................ 220
3.3 Correcting after Abnormal Completion ..................................................... 221
3.4 Error Code................................................................................................ 221
3.5 Low-Temperature Hydrobox Test Operation............................................ 221
3.6 Gas Furnace Test Operation.................................................................... 222
Part 5
Field Settings and
Test Operation
Содержание VRV EMERION RXYQ-AATJA
Страница 1: ...Service Manual Heat Pump 60 Hz RXYQ AATJA 208 230 V RXYQ AAYDA 460 V SiUS342303E...
Страница 380: ...Check SiUS342303E 373 Part 6 Service Diagnosis Reference Reference CHECK 7 Refer to page 379 CHECK 8 Refer to page 380...
Страница 405: ...SiUS342303E Wiring Diagrams Part 7 Appendix 398 RXYQ72 96 120 144 168 192 216 240AAYDA C 2D140769B...
Страница 406: ...Wiring Diagrams SiUS342303E 399 Part 7 Appendix 1 2 Indoor Unit FXFQ07 09 12 15 18 24 30 36 48TVJU 3D086460B...
Страница 407: ...SiUS342303E Wiring Diagrams Part 7 Appendix 400 BYCQ125BGW1 Self Cleaning Decoration Panel for FXFQ TVJU 3D076375A...
Страница 410: ...Wiring Diagrams SiUS342303E 403 Part 7 Appendix FXEQ07 09 12 15 18 24PVJU 3D098557A...
Страница 411: ...SiUS342303E Wiring Diagrams Part 7 Appendix 404 FXDQ07 09 12 18 24MVJU C 3D050501C...
Страница 413: ...SiUS342303E Wiring Diagrams Part 7 Appendix 406 FXMQ07 09 12 15 18 24 30 36 48 54PBVJU 3D093209B...
Страница 416: ...Wiring Diagrams SiUS342303E 409 Part 7 Appendix FXHQ12 24 36MVJU 3D048116C...
Страница 417: ...SiUS342303E Wiring Diagrams Part 7 Appendix 410 FXAQ07 09 12 18 24PVJU 3D075354F...
Страница 423: ...SiUS342303E Wiring Diagrams Part 7 Appendix 416 1 3 2 Energy Recovery Ventilator VAM Series VAM300 470 600GVJU 3D073269D...
Страница 424: ...Wiring Diagrams SiUS342303E 417 Part 7 Appendix VAM1200GVJU 3D073270D...