SiUS342303E
Basic Control
Part 4 Functions and Control
104
5.2 Compressor PI Control
In order to provide a steady capacity, the compressor capacity is controlled to achieve temperature
Te (or Tc) during cooling (or heating) operation.
During cooling (or heating) operation
The compressor capacity is controlled so Te (or Tc) approaches TeS (or TcS) (target value of
temperature).
1. VRTsmart Control
When all the connected indoor units are VRTsmart control applicable models
The required capacity is calculated based on the operation condition of each individual indoor unit
and this data is transmitted to the outdoor unit. The outdoor unit adjusts the refrigerant temperature
of the whole system to an adequate value according to the indoor unit that needs the most
capacity.
In case of target evaporation (or condensation) temperature adjustment, first the capacity is
adjusted by changing the indoor unit airflow to L tap. If the capacity is still too much, the target
evaporation (or condensation) temperature is elevated further to adjust.
2. VRT Control
When one or more of the connected indoor units are not VRTsmart control applicable models
If the required capacity becomes low (or high) in all indoor units (Room temperature Th1 - set
temperature), the target evaporation (or condensation) temperature is elevated further to adjust. In
the outdoor unit, the difference of temperature (
∆
T) in all indoor units is checked and the set
temperature is changed. Unlike VRTsmart control, there is no airflow control of the indoor units.
3. Te fix Control (for cooling)
The target evaporation temperature is not changed.
Te value (Set in mode 2-8)
Te: Low pressure equivalent saturation temperature
TeS: Te target value (varies according to Te setting, compressor operation frequency, etc.)
4. Tc fix Control (for heating)
The target condensation temperature is not changed.
Tc value (Set in mode 2-9)
Tc: High pressure equivalent saturation temperature
TcS: Tc target value (varies according to Tc setting)
Standard
(Factory setting)
High
6°C
(42.8°F)
7°C
(44.6°F)
8°C
(46.4°F)
9°C
(48.2°F)
10°C
(50.0°F)
11°C
(51.8°F)
Low
Standard
High
(Factory setting)
41°C
(105.8°F)
43°C
(109.4°F)
46°C
(114.8°F)
Содержание VRV EMERION RXYQ-AATJA
Страница 1: ...Service Manual Heat Pump 60 Hz RXYQ AATJA 208 230 V RXYQ AAYDA 460 V SiUS342303E...
Страница 380: ...Check SiUS342303E 373 Part 6 Service Diagnosis Reference Reference CHECK 7 Refer to page 379 CHECK 8 Refer to page 380...
Страница 405: ...SiUS342303E Wiring Diagrams Part 7 Appendix 398 RXYQ72 96 120 144 168 192 216 240AAYDA C 2D140769B...
Страница 406: ...Wiring Diagrams SiUS342303E 399 Part 7 Appendix 1 2 Indoor Unit FXFQ07 09 12 15 18 24 30 36 48TVJU 3D086460B...
Страница 407: ...SiUS342303E Wiring Diagrams Part 7 Appendix 400 BYCQ125BGW1 Self Cleaning Decoration Panel for FXFQ TVJU 3D076375A...
Страница 410: ...Wiring Diagrams SiUS342303E 403 Part 7 Appendix FXEQ07 09 12 15 18 24PVJU 3D098557A...
Страница 411: ...SiUS342303E Wiring Diagrams Part 7 Appendix 404 FXDQ07 09 12 18 24MVJU C 3D050501C...
Страница 413: ...SiUS342303E Wiring Diagrams Part 7 Appendix 406 FXMQ07 09 12 15 18 24 30 36 48 54PBVJU 3D093209B...
Страница 416: ...Wiring Diagrams SiUS342303E 409 Part 7 Appendix FXHQ12 24 36MVJU 3D048116C...
Страница 417: ...SiUS342303E Wiring Diagrams Part 7 Appendix 410 FXAQ07 09 12 18 24PVJU 3D075354F...
Страница 423: ...SiUS342303E Wiring Diagrams Part 7 Appendix 416 1 3 2 Energy Recovery Ventilator VAM Series VAM300 470 600GVJU 3D073269D...
Страница 424: ...Wiring Diagrams SiUS342303E 417 Part 7 Appendix VAM1200GVJU 3D073270D...