4.7 Vacuuming and Dehydration Procedure
CHECK 8
Conduct vacuuming and dehydration in the piping system following the procedure for Normal
vacuuming and dehydration described below.
Furthermore, if moisture may get mixed in the piping system, follow the procedure for Special
vacuuming and dehydration described below.
Normal vacuuming and dehydration
1. Vacuuming and dehydration
Use a vacuum pump that enables vacuuming up to 500 microns.
Connect manifold gauges to the service ports of liquid pipe and gas pipe and run the
vacuum pump for a period of 2 or more hours to conduct evacuation to 500 microns.
If the degree of vacuum does not reach 500 microns or less even though evacuation is
conducted for a period of 2 hours, moisture will have entered the system or refrigerant
leakage will have been caused. In this case, conduct evacuation for a period of another 1
hour.
If the degree of vacuum does not reach 500 microns or less even though evacuation is
conducted for a period of 3 hours, conduct the leak tests.
2. Leaving in vacuum state
Leave the compressor at the degree of vacuum of 500 microns or less for a period of 1 hour
or more, and then check to be sure that the vacuum gauge reading does not rise. (If the
reading rises, moisture may have remained in the system or refrigerant leakage may have
been caused.)
3. Additional refrigerant charge
Purge air from the manifold gauge connection hoses, and then charge a necessary amount
of refrigerant.
Special vacuuming and dehydration
Use this procedure if moisture may get into the piping, such as construction during the rainy season
(dew condensation may occur, or rainwater may enter the piping during construction work).
1. Vacuuming and dehydration
Follow the same procedure as that for normal vacuuming and dehydration described above.
2. Vacuum break
Pressurize with nitrogen gas up to 375,000 microns.
3. Vacuuming and dehydration
Conduct vacuuming and dehydration for a period of 1 hour or more. If the degree of vacuum
does not reach 500 microns or less even though evacuation is conducted for a period of 2
hours or more, repeat vacuum break - vacuuming and dehydration.
4. Leaving in vacuum state
Leave the compressor at the degree of vacuum of 500 microns or less for a period of 1 hour
or more, and then check to be sure that the vacuum gauge reading does not rise.
5. Additional refrigerant charge
Purge air from the manifold gauge connection hoses, and then charge a necessary amount
of refrigerant.
Содержание VRV EMERION RXYQ-AATJA
Страница 1: ...Service Manual Heat Pump 60 Hz RXYQ AATJA 208 230 V RXYQ AAYDA 460 V SiUS342303E...
Страница 380: ...Check SiUS342303E 373 Part 6 Service Diagnosis Reference Reference CHECK 7 Refer to page 379 CHECK 8 Refer to page 380...
Страница 405: ...SiUS342303E Wiring Diagrams Part 7 Appendix 398 RXYQ72 96 120 144 168 192 216 240AAYDA C 2D140769B...
Страница 406: ...Wiring Diagrams SiUS342303E 399 Part 7 Appendix 1 2 Indoor Unit FXFQ07 09 12 15 18 24 30 36 48TVJU 3D086460B...
Страница 407: ...SiUS342303E Wiring Diagrams Part 7 Appendix 400 BYCQ125BGW1 Self Cleaning Decoration Panel for FXFQ TVJU 3D076375A...
Страница 410: ...Wiring Diagrams SiUS342303E 403 Part 7 Appendix FXEQ07 09 12 15 18 24PVJU 3D098557A...
Страница 411: ...SiUS342303E Wiring Diagrams Part 7 Appendix 404 FXDQ07 09 12 18 24MVJU C 3D050501C...
Страница 413: ...SiUS342303E Wiring Diagrams Part 7 Appendix 406 FXMQ07 09 12 15 18 24 30 36 48 54PBVJU 3D093209B...
Страница 416: ...Wiring Diagrams SiUS342303E 409 Part 7 Appendix FXHQ12 24 36MVJU 3D048116C...
Страница 417: ...SiUS342303E Wiring Diagrams Part 7 Appendix 410 FXAQ07 09 12 18 24PVJU 3D075354F...
Страница 423: ...SiUS342303E Wiring Diagrams Part 7 Appendix 416 1 3 2 Energy Recovery Ventilator VAM Series VAM300 470 600GVJU 3D073269D...
Страница 424: ...Wiring Diagrams SiUS342303E 417 Part 7 Appendix VAM1200GVJU 3D073270D...