Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
8 - Maintaining the instrument
229
Clean off all fingerprints on quartz parts before installing them. This prevents premature ageing of
quartz parts. Use acetone, for example, for cleaning.
Top view furnace
The following picture shows a top view of the furnace pulled out:
Legend:
1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Plug of Reductor
6 Reductor
Phase 1: Installing reaction tubes
Proceed as follows:
Close the Reductor (6) with the plug (5) and well as with the bottom plug.
Close the combustion tube (4) with the combustion tube connector (3).
Close the post combustion tube (2) with the plug (1).
Insert the reaction tubes into the furnace:
Insert the combustion tube (4) in the middle, as seen from the front; the combustion tube
fixing pin (5) must snap into the holder (6).
Insert the Reductor (6) on the right, as seen from the front.
Insert the post combustion tube (2) on the left, as seen from the front.
Check that the reaction tube comes to rest on the bottom of the holder. The holders are
height-adjustable so as to allow for reaction tube length tolerances.
Install the quartz glass bridge between the combustion tube outlet and the post combustion tube
inlet.
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......