Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
8 - Maintaining the instrument
226
Removing the reaction tubes from the furnace
Process
The section is divided into the following phases:
Preparing the instrument, gas pressure
Removing reaction tubes
Safety instruction
Strictly observe the safety instruction "Removing reaction tubes" under
Warning notes during
operation
(on page 24).
Requirements
Before starting work, the following requirements must be met:
Keep a tube rack ready to hold hot components.
Phase 1, Preparing the instrument, gas pressure
In order to be able to prepare the instrument for maintenance works follow the instructions
"Preparing the instrument: Gas pressure" in Preparing and following up maintenance work.
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Bayonet catch
2 Handle
3 Connection Reductor
4 Ball valve fastening
5 Ground-in clamp
6 O
2
supply tube
7 Post combustion tube connection
Phase 2: Removing reaction tubes
Proceed as follows:
Open the front door.
Unscrew the combustion tube connector. To do so, turn the bayonet catch handle (2) to the right.
Remove the ground-in clamp (5) on the reductor (3).
Remove the ground-in clamp (5) on the plug of the post combustion tube (7).
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......