Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
8 - Maintaining the instrument
192
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Bayonet catch
2 Handle
3 Connection Reductor
4 Ball valve fastening
5 Ground-in clamp
6 O
2
supply tube
7 Post combustion tube connection
Phase 2: Refill the Regainer
Proceed as follows:
Open the front door.
Unscrew the combustion tube connector. To do so, turn the bayonet catch handle (2) slowly to
the right.
Remove the ground-in clamp (5) on the reductor (3).
Remove the O
2
supply tube (6) by opening the two ground-in clamps (5).
Remove the ground-in clamp (5) on the post combustion tube (7).
Top view furnace
The following picture shows a top view of the furnace pulled out:
Legend:
1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Plug of Reductor
6 Reductor
Phase 2: Refill the Regainer
Proceed as follows:
Press the post combustion tube plug (1) and the combustion tube connection (3) down lightly and
pull the furnace out of the instrument to the front.
Pull the combustion tube connection (1) out of the combustion tube (2) with careful jiggling
motions.
Place the post combustion tube plug (1) on the tube rack.
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......