Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
9 - Repairing the instrument
245
Plug the protective earth conductor back into the rear wall.
Attach the rear wall again.
Phase 4: Switch the instrument on again
Proceed as follows:
Plug the power supply plug of the analyzer into the socket.
Switch
PC,
monitor
and printer on.
Wait until the boot process is completed.
Launch the operating software. See
Starting the operating software
(on page 128).
Set the normal temperatures as the setpoint temperature of the furnaces under
System >
Furnace
.
Once the setpoint temperatures have been reached the instrument is ready to measure again.
What to do after a computer crash
After a computer crash
Because open documents are saved to a temporary file every 3 minutes, large-scale loss of data is
not usual. After a computer crash, restart the operating software and the software automatically loads
the most recent temporary file.
Reacting to a power failure
Open document
An open document is not lost in the event of a power failure. The temporary document file is
automatically loaded when the operating software is restarted.
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......