Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
8 - Maintaining the instrument
214
Removing the quartz glass bridge
Process
The section is divided into the following phases:
Preparing the instrument, gas pressure
Removing the quartz glass bridge
Furnace area
The following picture shows the furnace area in detail:
Legend:
1 Quartz glass bridge
Phase 1, Preparing the instrument, gas pressure
Safety instruction
Strictly observe the safety instruction "Gas pressure" under
Warning notes during operation
(on
page 24).
To prepare the instrument for maintenance work follow the instructions in Preparing and following up
maintenance work.
Phase 2: Removing the quartz glass bridge
Proceed as follows:
Open the front door.
Remove the ground-in clamps from both the combustion and post combustion tube (bottom side)
while holding the quartz glass bridge.
Detach the quartz glass bridge and place it on a non-combustible surface.
Protect the hot quartz glass bridge from unauthorized access.
Cleaning and installing the quartz glass bridge
What contaminations are possible?
Black residue (tar) indicate poor combustion and incorrect O
2
dosing.
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......