Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
9 - Repairing the instrument
242
F7 + F8
Furnace transformer
15 A
Process
The section is divided into the following phases:
Allow instrument to cool down and disconnect from the mains
Remove and check fuse
Insert fuses
Switch the instrument on again
Note
Please note:
If the fuses trip, please always notify your service office as there may be serious reasons for this.
Only use fuses matching the indicated type and the indicated voltage on the fuse holder. No
fuses with a higher amperage (A) may be used.
Safety instruction
Strictly observe the safety instruction "Replacing fuses" under
Warning notes during operation
(on
Phase 1: Allow instrument to cool down and disconnect from the mains
Proceed as follows:
Set the furnace off by
System > Ofen
.
Wait 2-3 hours until the instrument has cooled down to at least 55 °C.
Quit the operating software. Execute the following command:
File > Exit
.
Switch off the analyzer and its peripherals.
Disconnect the analyzer from the mains. Disconnect the power supply plug.
The instrument is now ready for removal of the fuses.
Fuse holder
The following picture shows a fuse holder from the side:
Phase 2: Remove and check fuse
Proceed as follows:
If a part of the instrument is no longer working, consult the above table to find out which fuse is
resposible for the component.
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......