Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
7 - Using the instrument
151
Single peaks
In general a single peak looks as follows:
Superimposed peaks
These are two peaks where one superimposes the other. Peak 1 is designated as "socket" and peak
2 is designated as "superimposed". The following picture shows such a run.
Melted peaks
These are two consecutive peaks where the second peak already starts although the first is not yet
finished. The graphic appears as follows:
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......