Operating instructions DuMaster D-480
©BÜCHI Labortechnik AG
8 - Maintaining the instrument
188
Place the ash crucible in the tube rack into the vent or else on a heat-resistant surface until it has
completely cooled down.
Protect the hot ash crucible from unauthorized access.
If there are any corundum balls sticking on the bottom of the ash crucible, top up some balls in
the combustion tube.
Installing the ash crucible
Note
The following section is a continuation of Removing the ash crucible. All steps described there must
already have been performed.
Process
The section is divided into the following phases:
Installing the ash crucible
Follow-up instrument preparation: Gas pressure / gas-tightness
Safety instruction
Strictly observe the safety instruction "Replacing the ash crucible/finger" under
Warning notes
during operation
(on page 24).
Requirements
The instrument must be in "Replace part" status. See instructions "Preparing the instrument, Gas
pressure" in Preparing and following up maintenance work.
Keep a tube extractor ready.
Keep a filled ash finger ready. See Filling the combustion tube.
Top view furnace
The following picture shows a top view of the furnace pulled out:
Legend:
1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Plug of Reductor
6 Reductor
Phase 1: Installing the ash crucible
Proceed as follows:
Содержание DuMaster D-480
Страница 1: ...DuMaster D 480 Operation Manual 11593626C en...
Страница 4: ......
Страница 12: ......
Страница 16: ......
Страница 30: ......
Страница 102: ......
Страница 181: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 8 Maintaining the instrument 181...
Страница 286: ...Operating instructions DuMaster D 480 B CHI Labortechnik AG 10 Menu and dialog descriptions 286...
Страница 338: ......
Страница 352: ......
Страница 353: ......