
Wiring is carried out on the standard terminal base or add-on terminal base. The following dia-
gram shows the recommended draw-out directions for the leads on the standard terminal base:
The lead draw-out directions are the same when using the add-on terminal base.
Standard terminal base
Lead draw-out
direction
Lead draw-out
direction
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
4-5
Chapter 4. WIRING
4 - 4
Layout of Terminals and Recommended Lead Draw-out Direction