2 - 23
SPEC
CABLE ROUTING DIAGRAM
Î
Fasten the neutral switch lead
and radiator breather hose to
the frame.
Ï
Fasten the neutral switch lead,
CDI magneto lead and radiator
breather hose to the frame.
Ð
Fasten the neutral switch lead,
CDI magneto lead, radiator
breather hose and clutch cable
to the frame over the radiator
mounting boss.
Ñ
Pass the radiator breather hose
in front of the radiator hose 2, on
the left of the chassis, and then
between the frame and radiator
hose 4.
Ò
Fasten the sub wire harness and
“ENGINE STOP” button lead to
the CDI unit bracket with the
clamp ends facing downward
behind the location where the
ground lead branches out from
the sub wire harness.
Ó
Fasten the ground lead and
cable guide together to the CDI
unit bracket.
Ô
Locate the clamp ends in the
arrowed range.
Õ
Fasten the neutral switch lead
and CDI magneto lead to the
frame over its hump.
C-C
G-G
E
2
Õ
4
5
8
E
É
D
G
G
A
A
B
D
5
Ì
Í
Í
Í
Î
F
E
D
2
2
2
Ï
Ð
Ò
Ñ
Ó
1
G
2
3
4
2
0
8
5
9
8
Ë
Ê
0
0
8
5
C
C
B
È
2
9
F
F
Ô
Ô
B-B
A-A
I
H
3
1
C
B
A
0
0
8
5
D-D
3
F-F
6
7
2
5
0
Summary of Contents for YZ450F(V)
Page 47: ...GEN INFO MEMO...
Page 67: ...GEN INFO MEMO...
Page 128: ...2 20 SPEC LUBRICATION DIAGRAMS 1 Intake camshaft 2 Exhaust camshaft To main axle From oil pump...
Page 193: ...INSP ADJ MEMO...
Page 593: ...ELEC MEMO...
Page 623: ...TUN MEMO...
Page 648: ......
Page 649: ......