5 - 43
CHAS
EC5B0000
HANDLEBAR
Extent of removal:
1
Handlebar removal
Extent of removal
Order
Part name
Q’ty
Remarks
HANDLEBAR REMOVAL
Preparation for removal
Number plate
Remove the band only.
1
Hot starter cable
1
Disconnect at the lever side.
2
Hot starter lever holder
1
3
Clutch cable
1
Disconnect at the lever side.
4
Clutch lever holder
1
5
“ENGINE STOP” button
1
6
Master cylinder
1
Refer to “REMOVAL POINTS”.
7
Throttle cable cap
1
8
Throttle cable #1 (pulled)
1
Disconnect at the throttle side.
9
Throttle cable #2 (pushed)
1
Disconnect at the throttle side.
10
Grip (right)
1
Refer to “REMOVAL POINTS”.
11
Tube guide
1
12
Collar
1
13
Grip (left)
1
Refer to “REMOVAL POINTS”.
14
Handlebar holder (upper)
2
15
Handlebar
1
16
Handlebar holder (lower)
2
1
HANDLEBAR
Summary of Contents for YZ450F(V)
Page 47: ...GEN INFO MEMO...
Page 67: ...GEN INFO MEMO...
Page 128: ...2 20 SPEC LUBRICATION DIAGRAMS 1 Intake camshaft 2 Exhaust camshaft To main axle From oil pump...
Page 193: ...INSP ADJ MEMO...
Page 593: ...ELEC MEMO...
Page 623: ...TUN MEMO...
Page 648: ......
Page 649: ......