8-1
E
HULL
HOOD
HANDLEBAR
HANDLEBAR
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
HANDLEBAR COVER REMOVAL
Follow the left “Step” for removal.
1
Screw
4
2
Handlebar cover
1
3
Band
2
4
Pad
1
5
Bolt
2
NOTE:
Position the corrugated tube for the throt-
tle cable as shown in the illustration so
that the tube attaches to the end of the
outer throttle cable.
6
Handlebar cover stay
1
7
Throttle cable
1
8
Bolt
4
9
Upper handlebar holder
2
10
Handlebar assembly
1
Reverse the removal steps for installation.