5-15
POWR
E
YPVS
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
8
Bolt
2
NOTE:
During installation, align the hole
a
in
the YPVS shaft with the bolt.
9
Shaft 2
1
10
Shaft 1
1
11
YPVS valve lever
2
12
Bolt
2
13
YPVS valve assembly
2
14
Oil seal
4
NOTE:
If the YPVS shaft is removed, the oil seal
must be replaced.
Reverse the removal steps for installation.