Supervision
Current Transformer Supervision Signals (Outputs States)
Name
Description
active
Signal: active
ExBlo
Signal: External Blocking
Alarm
Signal: Alarm Current Transformer Measuring Circuit Supervision
Commissioning: Current Transformer Failure Supervision
Precondition:
1. Measurement of all three phase currents (are applied to the
measuring inputs of the device).
2. The earth current is detected via a cable-type transformer (not in
Holmgreen connection).
Object to be tested
Check of the CT supervision (by comparing the calculated with the measured earth current)
.
Necessary means:
•
Three-phase current source.
Procedure, part 1:
•
Set the limiting value of the CTS to
»delta I=0.1*In«
.
•
Feed a three-phase, symmetrical current system (approx. nominal current) to the secondary side.
•
Disconnect the current of one phase from one of the measuring inputs (the symmetrical feeding at
secondary side has to be maintained).
•
Make sure that the signal »CTS.A
LARM
« is generated now.
Successful test result, part 1:
•
The signal »CTS.A
LARM
« is generated.
Procedure, part 2:
•
Feed a three-phase, symmetrical current system (approx. nominal current) to the secondary side.
•
Feed a current that is higher than the threshold value for the measuring circuit supervision to the earth
current measuring input.
•
Ascertain that the signal »CTS.A
LARM
« is generated now.
Successful test result, part 2
The signal »CTS.A
LARM
« is generated.
EN MRM4 01/11
Page 419
Summary of Contents for MRM4
Page 1: ...MRM4 HighPROTEC Motor Protection Device Manual DOK HB MRM4E...
Page 3: ...Order Code EN MRM4 01 11 Page 3...
Page 18: ...Important Definitions Page 18 EN MRM4 01 11 41 SG Prot ON 42 SG ON Cmd SG Prot ON SG ON Cmd...
Page 115: ...Navigation Operation Navigation Operation EN MRM4 01 11 Page 115 1 2 3 5 7 6 8 10 9...
Page 162: ...Recorder Name Description I 2 TripCmd Signal Trip Command Page 162 EN MRM4 01 11...