254 Run-time System CODESYS 2.3
WAGO I/O SYSTEM 750 XTR
750-8202/040-001 PFC200 2ETH RS TELE XTR
Manual
Version 1.2.0, valid from FW Version 03.01.07(13)
3.
To assign a new name to the task (e.g. PLC_Prog), click on “New Task”.
Then select the type of task. In this example, this is the “cyclic” type.
Observe the cycle time!
The minimum cycle time for I/O-based tasks is 2 milliseconds (ms)!
Figure 73: Changing Task Names 1